Skip to main content
{1}
##LOC[OK]##
{1}
##LOC[OK]##
##LOC[Cancel]##
{1}
##LOC[OK]##
##LOC[Cancel]##
Skip to main content
Home
|
Setup an Account
Log In
Public
Contractor
User Name:
Password:
Password:
Remember Me
Forgot Password
/Forgot Username
Permits/Registry/Applications
Apply / Register
Search Permits
Pay Fees
Projects
Apply for New Project
Search Projects
Pay Fees
Contractor
Search Contractors
Properties
Search Property
Inspections
Schedule
Cancel
Scheduled
License
Apply for New Licenses
Search Licenses
Pay Fees
Renew
Violations
Search
Report an Issue
Report Issue
Search Issues
Shopping Cart
Pay All Fees
Paid Items
Contact
Contact us
PreLoader
Project Search
Search By
Search By:
Project Number
Address
Project Type
Parcel
Search Operator:
Begins With
Contains
Equals
At Least
At Most
Search Value:
More Results
Click here for search examples
Map
Map Frame
No results
Search
Loading...
Projects
Buttons
Print
Search Results
Search Results
Results below
Search Details
Project #
SP18-081
Project Info
Site Info
Contacts (7)
Project Info
Description:
Crown Point F1 AMD 18 - Parker Adventist Medical Office Bldg
Type:
SITE PLAN
Subtype:
MAJOR AMENDMENT-NON RESIDENTIAL
Planner:
Bryce Matthews
Status:
PROB. ACCEPTANCE
Applied:
8/9/2018
Approved:
12/3/2019
Closed:
Expires:
6/3/2020
Status:
5/17/2021
Undefined:
Notes:
8/9/2018 1:08:10 PM The applicant, Parker Adventist Hospital, is requesting a Site Plan Amendment to add a new 5-story, 115,333 sq ft medical office building to their campus located in Crown Point, Filing No.1 Amendment 18. The site is located southeast of Parker Road and E-470 on Crown Crest Boulevard.
Linked Activities:
 
Parent Project
Parent Projects
7881
SITE PLAN
PLANNING COMPLETE
 
Project(s)
Sub Projects
SP21-101
SITE PLAN
PLANNING COMPLETE
SP21-044
SITE PLAN
PROJECT COMPLETE
SP21-008
SITE PLAN
PROJECT COMPLETE
SP20-125
SITE PLAN
PROJECT COMPLETE
SP20-054
SITE PLAN
PROJECT COMPLETE
SP19-130
SITE PLAN
PLANNING COMPLETE
Attachments
Attachments:
Crown Point F1 AMD 18-Parker Adventist-Probationary Acceptance.pdf
Crown Point F1 AMD 18-Parker Adventist-Probationary Acceptance.pdf
SP18-081_Drainage Letter_Signed-Sealed
SP18-081_Drainage Letter_Signed-Sealed.pdf
Crown Point F1 AMD 18 Parker Adventist MOB Civil Plans_Approved.pdf
Crown Point F1 AMD 18 Parker Adventist MOB Civil Plans_Approved.pdf
Crown Point F1 AMD 18 Parker Adventist MOB Utility Plans_Approved.pdf
Crown Point F1 AMD 18 Parker Adventist MOB Utility Plans_Approved.pdf
RFCC SP18-081 Parker MOB III Overall Utility - Signed by Cottonwood
RFCC SP18-081 Parker MOB III Overall Utility - Signed by Cottonwood.pdf
RFCC SP18-081 Parker MOB III Overall Utility - Fire Life Safety Stamped Plan Set 122319.pdf
RFCC SP18-081 Parker MOB III Overall Utility - Fire Life Safety Stamped Plan Set 122319.pdf
Civil Construction Documents
08-R5-Parker MOB III - Civil Construction Documents_20191210.pdf
Cottonwood Water and Sewer Plans
22-R1-Parker MOB III - Cottonwood Water and Sewer Plans_20191210.pdf
RFCC Approved Site Plan.pdf
RFCC Approved Site Plan.pdf
Signed Approval Letter.pdf
Signed Approval Letter.pdf
RFCC SP18-081 Crown Point F1 AMD 18 Parker Adventist MOB Bldg Site Plan Fire Life Safety 5th Review Ltr 110119.pdf
RFCC SP18-081 Crown Point F1 AMD 18 Parker Adventist MOB Bldg Site Plan Fire Life Safety 5th Review Ltr 110119.pdf
07-R4-Site Plan Exhibits
07-R4-Site Plan Exhibits.pdf
08-R4-Civil Construction Documents
08-R4-Civil Construction Documents.pdf
15-SP18-081 Comments - 4 Response
15-SP18-081 Comments - 4 Response.pdf
16-R1-Outside Referral Agency Comment Response
16-R1-Outside Referral Agency Comment Response.pdf
18-R4-EOPC - Right Turn Lane
18-R4-EOPC - Right Turn Lane.pdf
19-R4-EOPC - Public Improvements
19-R4-EOPC - Public Improvements.pdf
21-R1-Fire Riser Room Diagram
21-R1-Fire Riser Room Diagram.pdf
22-Water and Sewer Plans
22-Water and Sewer Plans.pdf
23-Water ESMT Exhibit - Signed
23-Water ESMT Exhibit - Signed.pdf
24-Sewer ESMT Exhibit - Signed
24-Sewer ESMT Exhibit - Signed.pdf
Site Plan redlines - 4.pdf
Site Plan redlines - 4.pdf
SP18-081 Comments - 4.doc
SP18-081 Comments - 4.doc
SP18-081 Crown Point F1 AMD 18 Parker Adventist MOB Bldg Site Plan Fire Life Safety 4th Review Ltr 091819.docx
SP18-081 Crown Point F1 AMD 18 Parker Adventist MOB Bldg Site Plan Fire Life Safety 4th Review Ltr 091819.docx
Site Plan Exhibits
07-R3-Site Plan Exhibits.pdf
Civil Construction Documents-Utility Plans
08-R3-Civil Construction Documents-Utility Plans.pdf
SP18-081 Comments - 3 Response
15-SP18-081 Comments - 3 Response.pdf
EOPC - Right Turn Lane
18-R3-EOPC - Right Turn Lane.pdf
EOPC - Public Improvements
19-R3-EOPC - Public Improvements.pdf
Parker Adventist Medical Office Town Engineering Memo_R3.pdf
Parker Adventist Medical Office Town Engineering Memo_R3.pdf
PSCo response 9.3.19
Crown Point F1 A18 Parker Adventist Hosp Med Ofc Bldg - 2nd referral SP18-081 - PSCo spcl.pdf
Site Plan redlines - 3.pdf
Site Plan redlines - 3.pdf
SP18-081 Comments - 3.doc
SP18-081 Comments - 3.doc
TCHD comments
5789_Parker Adventist MOB_190828_kboyer.pdf
DC Comments 8.21.19.pdf
DC Comments 8.21.19.pdf
SP18-081 Crown Point F1 AMD 18 Parker Adventist MOB Bldg Site Plan Fire Life Safety 3rd Review Ltr 082219.docx
SP18-081 Crown Point F1 AMD 18 Parker Adventist MOB Bldg Site Plan Fire Life Safety 3rd Review Ltr 082219.docx
SP18-081 Crown Point F1 AMD 18 Parker Adventist MOB Bldg Site Plan Fire Life Safety 3rd Review Ltr 082219.pdf
SP18-081 Crown Point F1 AMD 18 Parker Adventist MOB Bldg Site Plan Fire Life Safety 3rd Review Ltr 082219.pdf
Douglas County Referral Comments (Second Review)
SP18-081 2nd Referral.pdf
Douglas County Referral Comments (Second Review)
SP18-081 2nd Referral_1.pdf
Douglas County Referral Comments (Second Review)
SP18-081 2nd Referral_2.pdf
06-R2-Project Narrative
06-R2-Project Narrative.pdf
07-R2-Site Plan Exhibits
07-R2-Site Plan Exhibits.pdf
15-SP18-081 Comments - 2 Response
15-SP18-081 Comments - 2 Response.pdf
18-R2-EOPC - Right Turn Lane
18-R2-EOPC - Right Turn Lane.pdf
19-R2-EOPC - Public Improvements
19-R2-EOPC - Public Improvements.pdf
20-Civil-Comment Response
20-Civil-Comment Response.pdf
21-Fire Riser Room Diagram
21-Fire Riser Room Diagram.pdf
20-Civil-Comment Response
20-Civil-Comment Response_1.pdf
21-Fire Riser Room Diagram
21-Fire Riser Room Diagram_1.pdf
08-R2-Civil Construction Documents
08-R2-Civil Construction Documents.pdf
Narrative redlines - 2.pdf
Narrative redlines - 2.pdf
CD redlines - 2.pdf
CD redlines - 2.pdf
SP18-081 Comments - 2.doc
SP18-081 Comments - 2.doc
Site Plan redlines - 2.pdf
Site Plan redlines - 2.pdf
Parker Adventist Medical Office Town Engineering Memo_R2.pdf
Parker Adventist Medical Office Town Engineering Memo_R2.pdf
Project Narrative
06-R1-Project Narrative.pdf
Site Plan Exhibits
07-R1-Site Plan Exhibits.pdf
Civil Construction Documents
08-R1-Civil Construction Documents.pdf
Addendum to the Drainage Report
09-R1-Addendum to the Drainage Report.pdf
SP18-081 Comments - 1 Response
15-SP18-081 Comments - 1 Response.pdf
Initial Submittal Comment Responses
16-Initial Submittal Comment Responses.pdf
Fire Exhibit
17-Fire Exhibit.pdf
EOPC-Right Turn Lane
18-EOPC-Right Turn Lane.pdf
EOPC-Public Improvements
19-EOPC-Public Improvements.pdf
CenturyLink Comments 10.4.18.pdf
CenturyLink Comments 10.4.18.pdf
Parker Adventist Medical Office Town Engineering Memo_R1.pdf
Parker Adventist Medical Office Town Engineering Memo_R1.pdf
Signature Review Block (Revised Feb 2016).pdf
Signature Review Block (Revised Feb 2016).pdf
SP18-081 Comments - 1.doc
SP18-081 Comments - 1.doc
CD redlines - 1.pdf
CD redlines - 1.pdf
Narrative redlines - 1.pdf
Narrative redlines - 1.pdf
Site Plan redlines - 1.pdf
Site Plan redlines - 1.pdf
Cottonwood Comments Review 1
CTWD Comments_Parker Adventist Hospital MOB III plan review 1.pdf
PSCo response 9.27.18
Crown Point F1 A18 Parker Adventist Hospital MOB SP18-081 - PSCo letter.pdf
IREA MARK UP
IREA COMMENTS SP18-081.pdf
IREA BLANKET EASEMENT
IREA EASEMENT CROWN POINT LOT 1.pdf
Centennial Airport Referral Response
Referral Letter.pdf
TCHD Comments
5160_Crown Point Parker Adventist MOB_180925_kboyer.pdf
Douglas County Referral Comments
SP18-081.pdf
Signed Charge Back Agreement.pdf
Signed Charge Back Agreement.pdf
Application Submittal Checklist
00-Application Submittal Checklist.pdf
Land Use and Development Application
01-Land Use and Development Application-Signed.pdf
Title Commitment
02-Title Commitment.pdf
Letter of Authorization
03-Exhibit C-Letter of Authorization-Signed.pdf
Disclosure Letter
04-Exhibit D-Disclosure Letter-Signed.pdf
Charge Back Agreement
05-Charge Back Agreement-Sample.pdf
Project Narrative
06-Project Narrative.pdf
Site Plan Exhibits
07-Site Plan Exhibits.pdf
Civil Construction Documents
08-Civil Construction Documents.pdf
Addendum to the Drainage Report
09-Addendum to the Drainage Report.pdf
Existing Conditions Map
10-Existing Conditions Map.pdf
Traffic Impact Study
11-Traffic Impact Study.pdf
Legal Description
13-Legal Description.pdf
Vicinity Map
14-Vicinity Map.pdf
Parcel Info
Address:
9397 CROWN CREST BLVD
City/State/Zip:
PARKER, CO, 80138
Property Type
PARCEL
State Parcel:
223310213033
Subdivision:
CROWN POINT
Tract/Filing:
Block:
0
Lot:
1
Twp-Rng-Sect:
T6S R66W S10
Deeded Acres:
0
Linked Activities
Web Links
Attachments
Contact Type
Name
Phone
E-mail
Address
City/State/Zip
APPLICANT
RTA Architects
(719)471-7566
mpierson@rtaarchitects.com
19 S. Tejon Street, Suite 300
Colorado Springs, CO 80903
OWNER
Porter Care Adventist Health System
(303)269-4000
jonathanfisher@centura.org
9395 Crown Crest Boulevard
Parker, CO 80138
CONTRACTOR
VERTIX BUILDERS
(303)596-8737
bmcquinn@VERTIXBUILDERS.COM
178 1st Street
Firestone, CO 80520
CHARGE BACK
AdventHealth Parker
(303)269-4009
erin.ward@adventhealth.com
9395 Crown Crest Boulevard
Parker, CO 80138
ENGINEER
SA Miro
(720)407-1070
mvogt@samiro.com
4582 South Ulster Parkway
Denver, CO 80237
DEVELOPER
PKR MOB III, LLC
(303)830-1444
PWassik@healthconnectproperties.com
7350 East Progress Place, Suite 106
Greenwood Village, CO 80111
OTHER
Parker Adventist Hospital
()-
9395 Crown Crest Blvd.
Parker, CO 80138
X
SP
SP17
SP17-0001